Read the scope before the total
Highlight each action in the estimate and mark whether it is included, optional or conditional on inspection. A line saying “from” or “subject to diagnosis” is not the same as a fixed quotation. Ask the workshop which assumptions could change the amount.
Put it into practice
- Separate confirmed work from allowances.
- Ask what could change after inspection.
- Keep answers beside the estimate.